CC19 Members Gallery

Shared gallery for Capecutter 19 Association Members


474.jpg
314 viewsLuff reefing. Line tied to gooseneck fitting, up sail, through cringle, back down other side of sail, under reefing horn and aft along boom to cleat.
475.jpg
301 viewsLuff reefing line cleat.
566.jpg
278 viewsLeather on mast, to prevent damage to varnish by parrel beads.
567.jpg
320 viewsChain bobstay in raised position.
To prevent fouling of the mooring rope when on a swinging mooring.
568.jpg
360 viewsForedeck arrangements.
569.jpg
333 viewsJambing cleats for quick tensioning of bobstay, genoa outhaul and bowsprit shrouds.
570.jpg
366 viewsBowsprit shroud tensioning blocks. These allow quick tensioning of the shouds when the bowsprit is raised to give maximum stability when raising or lowering the mast.

The genoa outhaul blocks have been upgraded to 35mm ballbearing variety to reduce the effort required when using them to raise the mast. (Very successfull).
597.jpg
287 viewsQuarter berth extension cushion doubles as a seat cusion. Gives more comfortable seating position.
598.jpg
240 viewsQuarter berth extension base slides out from under cushion.
599.jpg
238 viewsExtension cushion in place. Much improved bed area.
629.jpg
265 views20 watt solar panel permanently fitted to new "blind" companionway garage top. This replaces the original which had a persistantly leaking light (window in non boat speak).
39.jpg
270 viewsFuse Panel 1
horse.jpg
Stainless Steel Horse.240 viewsHorse made to fit original mainsheet transom brackets. Easy to revert to original arrangements if required.
   
28 files on 2 page(s) 2