popeye wrote:Hi,
if the gaff is up and under full main you have to add 0.7m.
I`ve checked this by fixing a thin rope to the gaff peak and to load the other end by a heavy bolt. After raising the full main I marked the area where the rope comes out of the water. Then I took a tape measure to measure the hole length and the result was 7.4m.
Regards from Bavaria
Frank
Genius! Love it.
